AIVERSE
REAL ESTATE
Home
Solutions
Vision
Projects
Blog
Get Started
More
The United States of America
- 4 MW in 2 month, addition 6 MW in 6 month
- Two – 2MW Gen Sets, Three – 0.75MW Gen Sets, One 0.6MW Gen Sets
- Existing data center
- Extra capacity possible from GP
- 1,000 Acres land, some building
- 50 MW in 6-12 month
- Existing steel factory
- Power on, no need for substation
- Ameren Energy has multiple feeds to the building with a current 8MW
- can provide an additional 7.5MW with 12 months
- another 20MW within 14 months
- Shell data center suite in open floor condition
- 10 MW Power Ready, confirming dual feed status by July
- Exiting Fiber to the location, with option to upgrade to 10-100 G
- 8 MW in 9-12 month, Dual Feed
- 180,000 SF Warehouse
- 1,250 Acres land, some building
- Total of 400MW Dual Feed (800MW single line)
- 200 MW has been allocated to Crypto Farm
- 10 MW today, shell building, 14 acre land, 122,000 sf building
- 15 MW expendable in 6 month
- Excellent fiber connectivity via low-latency metro and long-haul networks
- Low Cost Energy provided by Duke Energy + tax incentives